comp.jpg

Portfolio

DSC_1040.JPG

“Bay Medical Center West Medical Mall, Bay City, MI. This building was built for specialized M.R.I., C.A.T., P.E.T SCAN, X-RAY, plus Dr. Offices of many fields. This building was fast tracked starting on the 15th of July, with turn over to the owner December 1st.”

DSC_1044.JPG

Mid-Michigan Medical Center, Midland Michigan, 750 kw Emergency backup generator with a 500 gallon double lined, concrete fuel tank.

DSC_1049.JPG

Mid-Michigan Medical Center,  Midland,  Michigan. Riecker  Surgical Center. This is an advanced O.R. for outpatient surgeries.

Pioneer.jpg

Coal fired electric generating plant in Michigan.

Pioneer.jpg

Central Michigan University Student Housing. Three 5 story buildings built and connected to existing 3 buildings 9 story. A connector was built to tie all six buildings together with one common fire alarm to the six buildings. This was a 14 month project with 2 weeks of utilities shut down for all tie ins to the campus.

Pioneer.jpg

Saginaw Valley University, Pioneer Hall, a L.E.E.D.S project. This building is the new technology for “GREEN”. The project was one of Michigan’s largest L.E.E.D for 2007 and 2008. The building houses Industrial and Science training. Photo courtesy of Spence Brother Construction.